WaterStation Civil Works Installation

Installation of WaterStation well models and accessories.

Important - Always check the handover procedure to ensure that the product is handed over according to the requirements.

Installation applies to the following models:

Burial

Anchoring

Solid material must be used to secure the well against buoyancy:

For example, if the base plate is 100x100 cm, the stabilizing gravel must fill 30x115x115 cm (HxWxL).

Heavy Traffic

If WaterStation is used in areas with heavy traffic, a concrete ring must be established and finished with a well frame and cover:

WaterStation heavy traffic well cover illustration

Pedestrian Traffic

If WaterStation is used in green areas or areas with pedestrian traffic, it can be finished with an aluminium cover.

WaterStation pedestrian traffic aluminium cover illustration

 


Public revision 21/08/2026