WaterStation is delivered factory-set and ready for testing.
Have the control points described in handover been completed?
Have 120 ohm terminations been installed on RS485?
Has a function testExamples of VikMote SMS commands for changing, adding, listing, and deleting access codes. been carried out on each outlet to verify that the water can open and close when a user operates the system?
Has a leak test with pressure testing been carried out to verify watertightness?
If required, have the pipe and meter been technically insulated?